Before production begins, the parcel delivery box model, dimensions, material requirements, components, finish, labels and packaging direction should be confirmed.
Production follow-up then connects those approved requirements with material preparation, fabrication, assembly, surface finishing and final packing preparation.
Review the approved dimensions, structure, hardware, finish and other product requirements before production release.
Prepare the production sequence according to the confirmed structure, components, quantity and delivery arrangement.
Check important product details during panel processing, structural assembly, coating and component installation.
Confirm the finished product, accessories, hardware packs, labels and packaging requirements before shipment preparation.
The exact production sequence may vary by model and customization scope. The following stages show the typical workflow used for steel parcel delivery box projects.












For customized projects, the approved sample or signed product specification should provide the reference for repeat production. Important dimensions, components, finish, labels and packaging requirements should remain clearly documented.
Confirm the reference model, drawing, sample and agreed project details.
Release the confirmed structure, components, finish and packaging information for production planning.
Review early production units or key details when required for the project.
Check important production stages against the confirmed requirements.
Review finished products and agreed packaging details before shipment preparation.
Testing and inspection requirements vary by product configuration, destination market and buyer requirements. Any required performance test, packaging test, certification or third-party inspection should be identified before quotation and confirmed as part of the project scope.
Available quality information depends on the project, agreed inspection scope and production arrangement.
Dimensions, structure, components, material requirements and other approved product details.
Confirmed locks, handles, hinges, fasteners and other project-specific components.
Approved coating color, texture, appearance sample or other agreed finish information.
Project-specific checkpoints or inspection records when included in the agreed scope.
Production or inspection photos may be provided when agreed and operationally available.
Confirmed packaging structure, hardware packs, labels, instructions and carton requirements.
Specific reports, testing records and inspection documents should be agreed before the order. They should not be assumed to be included automatically.
What is checked during parcel delivery box production?
Is every parcel delivery box tested to the same standard?
Are PB-series models automatically IPX4 or weatherproof certified?
Can buyers request inspection photos or records?
Can a buyer arrange third-party inspection?
How are customized products controlled during repeat production?
Is packaging inspection included on this page?